FRP near me shop made in China replacement parts in Antananarivo Madagascar Blade Fan of EPT Cooling Tower 4700 mm with top quality

FRP near me shop made in China  replacement parts  in Antananarivo Madagascar Blade Fan of EPT Cooling Tower 4700 mm with top quality

We – EPG Team the most significant gearbox & motors , couplings and gears manufacturing unit in China with 5 distinct branches. For a lot more specifics: Mobile/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828

Overview

Industrial Geareducers are created and made particularly for cooling towers in massive industrial and electricity plant apps. In form and purpose, their design and style goes past standard needs- Both to improve air motion by means of the tower, and to minimize the affect of servicing.

Gearbox reducer

Reducer for the second equipment transmission, spiral bevel equipment and helical gear blended transmission technique.With compact construction, huge transmission power, sleek procedure, low sounds and other traits.The materials utilized by the equipment is 20CrMnTi, right after warmth remedy method, to ensure that the gear has greater use resistance and effect resistance.The lubrication method adopts the blend of oil immersion and splash movement lubrication. A specified volume of oil is retained in the box. The oil is despatched to the oil storage tank by the oil disc to make the oil movement and lubricate the bearing by means of the circulation channel.Skeleton oil seal or mechanical seal is adopted at the entrance of high-speed shaft. The protect of reducer need to be taken out after 8000 several hours of operation to check out the put on of the seal and decide whether to change it.

The lifting ring screw on the lid is for opening the lid of the gearbox when overhauling the gearbox. It are not able to be used for lifting the gearbox.The handle instrument contact screw gap is arranged on the box physique, which can be linked to the management device in accordance to the user’s demands.

Enthusiast functionality Parameter LF-forty seven

Parameter Model LF-47Aone LF-47Atwo LF-47B LF-47C LF-47D LF-47E
Fan Performance Parameter Impeller speed (r/min) 240 two hundred 240 240 240 240
Air Volume*104(mthree/h) sixty sixty sixty 78 60 60
Entire stress(Pa) 127.5 127.five 127.5 127.5 127.five 127.5
Blade angle 12.5° 12.5° 19° twelve.5° 12.5° twelve.5°
Blade variety four 4 four four 6 6
Blade shaft power(KW) twenty five.5 20 twenty five.5 38 25.five 25.five
 Pressure efficiency(%) eighty three.three eighty three.three 83.3 78.1 eighty three.3 83.three
Supporter fat(Kg) 549 510 543 549 543 543
Supporting Motor Model Y225M-6 Y180L-4 Y200L-4 Y225M-4/six YB225M-six Y200L-four
Electricity(KW) 30 22 30 45/fifteen thirty thirty
Weight(Kg) 292 195 245 333 292 245
Install Measurement A(mm) 356 279 318 356 356 318
B(mm) 311 279 305 311 311 305
C(mm) 2280 2256 2280 2280 2280 2280
E(mm) 3122 3070 3070 3122 3122 3070
F 557 577 557 575 557 557
Lone 340 330 340 350 340 340
L2 580 500 580 770 580 580

FRQ:
one. Are you maker ?
Reply: Sure we are a cooling tower maker situated in ZheJiang Province China. With 18 many years of manufacturing and OEM service for several model of famous cooling tower.
two. Can you offer the cooling tower elements different with the specification in below exhibiting sort ?
Response: We can manufacturer and recently design and style for specific buy based mostly on your offered specification and drawing or functionality specifications.
three. What products are you producing?
Response: cooling towers with its accessories (motor, steel frame, plastic parts, FRP panel, PVC infill, motor, h2o pump, motor supporter, management box for fan)
4. What is the delivery time?
Reply: For spherical sort cooling tower underneath 300RT, we have inventory in warehouse. other variety cooling tower, need to have to generation upon receive the PO. Top time 15 wor ept times.
five. What is your quality guarantee ?
Response: 1 12 months for motor, 2 years for steel areas, 5 years for FRP pannel. Free areas obtainable throughout gurrantee peorid.
six. How many employees wor ept in your manufacturing unit ?
Answer: 270 employees at the finish of 2013.
7. Do you have any generation management system or certification for items.
Solution: ISO 9001:2008 high quality and environment management system certificates. CTI member certification for cooling towers.

Loading and shipping 

You might be also intrigued in underneath other variety cooling tower, remember to go to our web site:  

 

The use of original tools manufacturer’s (OEM) component quantities or logos , e.g. CASE® and John Deere® are for reference purposes only and for indicating product use and compatibility. Our firm and the shown replacement areas contained herein are not sponsored, accredited, or manufactured by the OEM.

FRP near me shop made in China  replacement parts  in Antananarivo Madagascar Blade Fan of EPT Cooling Tower 4700 mm with top quality

FRP near me shop made in China  replacement parts  in Antananarivo Madagascar Blade Fan of EPT Cooling Tower 4700 mm with top quality